DATUMKEEP
Capabilities · Quality

Statistics honest enough to say “not enough data.”

Most capability reporting is fiction: a Cpk computed on non-normal data, with no confidence interval, from a gauge nobody validated. A capability number without its interval is a guess with good posture. DatumKeep computes process quality the defensible way — every index with its interval, every honest state shown, and a refusal when the data cannot carry the claim.

Control charts & capability

Every rule. Every interval. Every refusal.

The chart and the capability panel are one surface, computed backend-side so there is no client-side math drift — and built to withhold a number rather than invent one.

DatumKeep · Process CapabilityREF-04 · zone-3 peak °C1 rule tripped
Control chart · all 8 Nelson run rules evaluated
UCLCL · locked baselineLCLNelson 2 · 9 points one side of centreI-MR · individuals · phase-I baseline locked · 22 subgroups
Capability · Ppk with its interval
LSLUSLoverall distribution vs. spec window
0.94decision number · Ppk 95% CI lower bound
Ppk 1.12 [0.94 – 1.30]target 1.33
Honest states · when the engine refuses
n = 4Insufficient data — indices withheld
Non-normalBox-Cox applied · λ CI reported
n < 8Normality returns unknown, not a verdict
A withheld index is a result, not a gap — the provenance is kept so the number appears the moment the data can carry it.
Process quality surface · electronics / SMT reflow · illustrative data
All eight Nelson run rules, evaluated against a locked phase-I baseline — not a baseline that quietly re-fits itself to the drift you are trying to catch.
Individuals and moving-range charts, plus X̄-R and X̄-S charts for rational subgroups — with the subgroup sigma the rules actually require, not a one-size-fits-all limit.
Capability with real intervals: Cp/Cpk within, Pp/Ppk overall, each reported with its confidence interval. The decision number is the interval's lower bound — a single point estimate is a guess with good posture.
Box-Cox for non-normal processes, with the λ confidence interval and transformed spec limits shown — never normal-theory math applied silently to data that does not support it.
Honest refusal states: below the reliability floor the indices are withheld, not fabricated; normality returns unknown for small samples rather than a false verdict. “Not enough data” is an answer.
A violation becomes an investigation in one click — the chart, the capability interval, the gauge study and the root-cause analysis live in one system.

The AI never touches your math.

Control charts, capability, Gage R&R and every test are deterministic engines. The AI explains and proposes — it cannot compute a number into existence. Where narration is switched on, the engine authors every figure and every verdict, and any sentence that tries to state one is discarded before you see it.

MSA · Gage R&R

Before you fix the process, trust the gauge.

Measurement-system error masquerades as process variation, and teams spend months fixing processes that were fine. The gauge study is not an appendix here — it gates what the evidence is allowed to claim.

Gage R&R by the ANOVA method

Crossed studies with variance partitioned into repeatability, reproducibility and part-to-part — not the older average-and-range shortcut. You get %Contribution, %StudyVar, %Tolerance and ndc, banded acceptable / marginal / unacceptable, with thin-design and unbalanced-study flags that bound how strong the rating is allowed to sound. Calibration records sit alongside, with an overdue view.

The trust gate

The gauge verdict follows the data into the analysis: evidence from an untrustworthy gauge is downgraded before conclusions are drawn, and the investigation says so out loud. That is the difference between a measurement study you file and one that changes the answer.

Ask SPC

Ask in plain language. Get computed answers.

Your quality engineers should not need to remember which tool answers which question. Ask SPC turns the question into the right statistical call — and the engine, not the model, produces the number.

DatumKeep · Ask SPCSMT line · last 90 days
Which parameters are trending toward a limit?
engine calltrend_projection · 12 parameters · deterministic

One of the twelve parameters is projected to cross a limit within the horizon. Two others cannot be answered honestly yet — here is why for each:

REF-04 · zone-3 peak tempHeading for UCL
Theil-Sen slope +0.31 °C/day · projected crossing inside the pre-stated horizon
PRESS-02 · seal forceNo reliable trend
Slope interval spans zero — the engine declines to project
MILL-11 · bore ØInsufficient history
n below the reliability floor — no answer offered
Computed, never guessed. The assistant chooses which statistical tool to run and puts the result in plain language. Every number above — and every refusal — comes from the deterministic engine.
Ask SPC · illustrative conversation
Questions run against a fixed battery of statistical tools. You choose what to compare — never how — so the method cannot be shopped until it agrees with you.
The honest states come back with the answers: no reliable trend, insufficient history, no applicable limit. A question the data cannot answer gets told that it cannot be answered.
Every answer names the tool that produced it, so a reviewer can reproduce the number without taking the sentence on faith.
Watchtower routines

Program what to watch. The platform watches it.

Between incidents, nobody is looking. A Watchtower routine is a standing watch over a parameter, a machine or a whole line — running on your schedule, with the checks you chose, reporting quietly when there is nothing to say.

DatumKeep · MonitoringActive

SMT reflow · morning watch

Watch every reflow parameter on SMT-01 and tell me what changed overnight.

Baseline breaksSmall driftsTrend to limitCapabilitySilent-sensor watch
Scope
Line · SMT-01 (12 parameters)
Cadence
Daily · 06:00
Next run
in 4 h
Last run · 2 findingszone-3 peak temp — baseline break · zone-1 soak — no reading for 31 h
Monitoring routine · illustrative data
Pick the scope and the checks; the tuning stays pre-declared by the engine, so nobody can widen a threshold until an alert goes away.
Including the sensor that silently stops reporting — the failure mode every dashboard misses, because a parameter with no new data looks exactly like a parameter behaving perfectly.
A run that finds nothing is recorded as quiet, not hidden. An engine that cannot assess a parameter says which honest state stopped it.
Zero model tokens: the whole detector pass is deterministic computation.
Opt-in, flag-gated rolloutWatchtower routines are an opt-in, flag-gated rollout — off by default, enabled per workspace by an admin, and a person always decides what happens next.
Study proposals

It doesn't just alert. It designs the next analysis.

An alert hands you a problem. A proposal hands you the next move — a specific study, with its design pre-declared before any number is computed.

A qualifying signal turns into a concrete study: a two-arm comparison over frozen date windows, or a multivariate study across the parameters that moved together.
Pre-declared before any number is computed. Windows and battery are frozen when the proposal is written, so the design cannot be adjusted after someone glimpses the result.
Proposals for the same situation attach to the open one instead of piling up, and a dismissal is respected for a cooling-off period rather than re-raised the next morning.
Launching is a human act. The engine designs; a person decides whether the question is worth asking.
Opt-in, flag-gated rolloutStudy proposals are an opt-in, flag-gated rollout — off by default, enabled per workspace, and never launched without a person clicking launch.
DatumKeep · SignalsProposed
Study kind

Compare parameters · two arms

Raised from: baseline break on REF-04 · zone-3 peak temp, morning watch run of 2026-07-17.

Arm A
2026-07-03 → 2026-07-10
Arm B
2026-07-10 → 2026-07-17
Windows and statistical battery are frozen at proposal time — declared before a single number is computed, so the design cannot be shopped after seeing the result.
A person decides — nothing runs on its own.
Study proposal · illustrative data
Joint studies

Some problems are only visible from above.

A parameter can be in control on its own chart and badly out of place next to the others. Joint studies look at the machine, the line, and the fleet — with the discipline to not over-read what they find.

Equipment and line studies

Analyse a machine or a whole line as one system: many parameters compared over the same frozen window, plus a multivariate Hotelling T² view that catches the joint excursion no single chart shows — each parameter still inside its own limits while the combination is not.

Cross-equipment common-cause screening

When several machines wobble in the same week, the engine screens for a shared cause and reports what it can support. Temporal coincidence alone is never called a common cause — a co-occurrence is reported as a co-occurrence, and the phrasing does not get upgraded because it would read better.

Control charts, capability and Gage R&R · Ask SPC live today — Scheduled monitoring routines · Proposed statistical studies shipped · off by default
Classical SPC done honestly — not predictive analytics

Bring a capability report you don't trust.

The fastest way to judge statistics is to point them at a number you already argue about. Bring one to a 30-minute demo — and bring your black belt.